Tower Project

Multiple Bengal groups worked together to transport, lift and set this 190’ tower. The tower was transported by Bengal from a fab shop in Tennessee with steer dolly transporter. The tower was set on stands in lay down area for prepping. Transported into site with hydraulic deck trailer and prime mover. The final set was done by tandem lift using a LR1600 with wagon and a Manitowoc 11,000.